- For the upright post, according to installation manual, stick the number label, fix the clamp, packed.
- For some plastic panel, pre install the panel pipe.
- For the tube slide, install the total set, then pre drill the hole for two section and fix, then disassembly in order to ship easily, pack.
- For bone bridge,assembly as one unit.
- Design
- Manufacturing
- Installation
Step 1
Consultation
Clients supply the CAD drawing or area for the playground and the requirement, budget and features of their target market.

Step 2
Plan & Design
Qitele Make the Landscape design and planning, and draw the draft.


Step 3
Drawing Rendering
Imple computer tools to make the drawing, include the rendering, CAD top view and etc.

Step 4
Interl Inspection
The Design director and the salesman check and prepare the list of items in the drawing.




Step 5
Confirm Design
Show rendering, CAD and lists to clients, making final design confirmation.

Platform Class Processing

Punching
Punching
Step 1Punching
Step 1 Punching

Welding
Welding
Step 2Welding
Step 2 Welding

Rust removing
Rust removing
Step 3Rust removing
Step 3 Rust removing

PVC coated
PVC coated
Step 4PVC coated
Step 4 PVC coated

Packing for delivery
Packing for delivery
Step 5Packing for delivery
Step 5 Packing for delivery
Plastic Processing

Milling powder
Milling powder
Step 1 Milling powder
Step 1 Milling powder

Powder inrotainal mold
Powder inrotainal mold
Step 2 Powder inrotainal mold
Step 2 Powder inrotainal mold

Panel finished
Panel finished
Step 3 Panel finished
Step 3 Panel finished

Trimming
Trimming
Step 4 Trimming
Step 4 Trimming

Installation
Installation
Step 5 Installation
Step 5 Installation
Iron Processing

Cutting and crooking
Cutting and crooking
Step 1Cutting and crooking
Step 1 Cutting and crooking

Welding
Welding
Step 2Welding
Step 2 Welding

Polishing
Polishing
Step 3Polishing
Step 3 Polishing

Painting
Painting
Step 4Painting
Step 4 Painting

Installation
Installation
Step 5Installation
Step 5 Installation

Packing for delivery
Packing for delivery
Step 6Packing for delivery
Step 6 Packing for delivery
Plastic Parts Pre-installation

Install slide barrels and hoardings
Install slide barrels and hoardings
Step 1Install slide barrels and hoardings
Step 1 Install slide barrels and hoardings

Connect slide barrels
Connect slide barrels
Step 2Connect slide barrels
Step 2 Connect slide barrels

Drill holes on the slide barrels, trial to build
Drill holes on the slide barrels, trial to build
Step 3Drill holes on the slide barrels, trial to build
Step 3 Drill holes on the slide barrels, trial to build

The effect of slide barrels trial
The effect of slide barrels trial
Step 4The effect of slide barrels trial
Step 4 The effect of slide barrels trial
Show Details

Milling powder
Milling powder
Step 1Milling powder
Step 1 Milling powder

Powder in rotaional mold
Powder in rotaional mold
Step 2Powder in rotaional mold
Step 2 Powder in rotaional mold

Panel finished
Panel finished
Step 3Panel finished
Step 3 Panel finished

Panel finished
Panel finished
Step 4Panel finished
Step 4 Panel finished
Iron Parts Installation

Put the pipes neatly
Put the pipes neatly
Step 1Put the pipes neatly
Step 1 Put the pipes neatly

Install the large couplers
Install the large couplers
Step 2Install the large couplers
Step 2 Install the large couplers

Install platform couplers
Install platform couplers
Step 3Install platform couplers
Step 3 Install platform couplers

Stick the number labels
Stick the number labels
Step 4Stick the number labels
Step 4 Stick the number labels

Install the caps on the pipes
Install the caps on the pipes
Step 5Install the caps on the pipes
Step 5 Install the caps on the pipes
Tipes